Abstract: With this issue of the Technical Design Phase Monthly Report, you will find summary notes for the Group's monthly meetings (Main Linac Technology - Superconducting RF, Conventional Facilities and Siting, and Accelerator Systems), and a report from the Cost and Schedule Group (Peter Garbincius). These meeting notes show progress made and plans for upcoming meetings and work. This monthly report complements the weekly ILC Newsline. Please see the `Director's Corner' for important planning and policy communication. The Project Managers' attention continues to be focused on how to organize the R&D activities during the Technical Design Phase 1, taking into account the available resources. HLRF distribution "RF Clustering" proposal, Plug Compatibility, Single/Shallow tunnel and Minimum Machine are the main issues, and these will be discussed also in the coming Chicago GDE meeting.

The record appears in these collections:
Accelerator Design & Technology > ILC Global Systems > Conventional Facilities & Services
Accelerator Design & Technology > ILC Beamline Areas > Beam Delivery System (BDS)
Accelerator Design & Technology > ILC Beamline Areas > Ring-to-Main-Linac (RTML)
Accelerator Design & Technology > ILC Beamline Areas > Damping Ring (DR)
Accelerator Design & Technology > ILC Beamline Areas > Positron Source
Accelerator Design & Technology > ILC Beamline Areas > Electron Source
Accelerator Design & Technology > ILC Beamline Areas > Main Linac
Documentation > Internal Documents > ILC Internal Documents
Accelerator Design & Technology > ILC General

 

 Record created 2008-10-23, last modified 2008-10-23


Fulltext:
Download fulltext
Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)