Report / ACCDT / DR ILC-REPORT-2007-005

Report of the Engineering Design Planning Task Force

Ross, M ; Paterson, E ; Kephart, B ; Wolski, A ; Lilje, L ; Oide, K ; Hayano, H ; Toge, N

Abstract: The Engineering Design Planning task force was created by the ILC Executive Committee in March 2007 to assist it in adapting the organization of the GDE to support the creation of an Engineering Design Report (EDR). Our major conclusions are summarized in the following bullets. - That the Engineering Design effort and the process of creating an Engineering Design Report can and should be executed with appropriate, formal controls and reporting, i.e. a line-management organization - That the line-management organization for the Engineering Design effort above is viable through cooperation between the GDE management and the regional basis of resource support. - That the Conventional Facilities and Siting efforts will naturally be divided into those that support development of a specific host site (regional) and those that support development of site-independent features. We believe that it is possible and practical to link these and manage them together, through the EDR Project organization.

Keyword(s): EDR task force ; engineering design ; damping rings ; main linac ; beam delivery system ; conventional facilities and siting ; work package organization ; work group organization

The record appears in these collections:
Accelerator Design & Technology > ILC Global Systems > Conventional Facilities & Services
Accelerator Design & Technology > ILC Beamline Areas > Beam Delivery System (BDS)
Accelerator Design & Technology > ILC Beamline Areas > Damping Ring (DR)
Accelerator Design & Technology > ILC Beamline Areas > Main Linac
Documentation > Publications & Notes > Reports
Accelerator Design & Technology > ILC General

 

 Record created 2007-09-13, last modified 2008-09-16