ILC Notes

Latest additions:
2016-07-11
23:15
Implications of the 750 GeV gamma-gamma Resonance as a Case Study for the International Linear Collider / Fujii, K. ; Grojean, C. ; Peskin, M. E. ; Barklow, T. ; et al [ILC-NOTE-2016-067]
If the gamma-gamma resonance at 750 GeV suggested by 2015 LHC data turns out to be a real effect, what are the implications for the physics case and upgrade path of the International Linear Collider? Whether or not the resonance is confirmed, this question provides an interesting case study testing the robustness of the ILC physics case. [...]
Fulltext: Download fulltextGIF; Download fulltextGIF; Download fulltextPDF; Download fulltextPS.GZ
Detailed record - Similar records
2016-03-15
12:02
ILC possibilities at Z and W / Walker, N. J. [ILC-NOTE-2016-066]
Fulltext: Download fulltextGIF; Download fulltextPDF; Download fulltextPS
Detailed record - Similar records
2015-06-16
19:50
ILC Operating Scenarios / Barklow, T. ; Brau, J. ; Fujii, K. ; Gao, J. ; et al [DESY 15-102] [IHEP-AC-2015-002] [KEK Preprint 2015-17] [SLAC-PUB-16309] [ILC-NOTE-2015-068]
Fulltext: Download fulltextPDF; Download fulltextPS
Detailed record - Similar records
2015-06-13
01:10
Physics Case for the International Linear Collider / Fujii, K. ; Grojean, C. ; Peskin, M. E. ; Barklow, T. ; et al [DESY 15-094] [LAL 15-188] [MPP-2015-120] [SLAC--PUB--16302] [ILC-NOTE-2015-067]
We summarize the physics case for the International Linear Collider (ILC). [...]
Fulltext: Download fulltextPDF; Download fulltextPS.GZ
Detailed record - Similar records
2015-01-09
20:00
ILC Staging and Running Scenarios / ILC Parameters Joint Working Group ; Barklow,T. ; Brau, J. ; Fujii, K. ; et al [ILC-NOTE-2015-066]
The preferred scenario for realizing the ILC involves construction of the full 500 GeV machine from the start, as documented by the design in the ILC Technical Design Report. [...]
Fulltext: Download fulltextPDF; Download fulltextPS
Detailed record - Similar records
2012-09-13
23:39
ILC Intra-Train Feedback / Smith, S. [ILC-NOTE-2012-065]
Parameters for the Beam Position Monitor (BPM) and Stripline Kicker that can be used in the ILC Intra-Train Feedback system are derived and performance of the system estimated..
Realistic BPM and Kicker designed & feedback performance estimated.: Download fulltextDOC; Download fulltextDOCX; Download fulltextODT; Download fulltextPDF (PDFA); Download fulltextPS.GZ
Detailed record - Similar records
2012-09-13
23:20
Ground Vibration Measurements at LHC Point 4 / Bertsche, K.J. ; Gaddi, A. [ILC-NOTE-2012-064]
Ground vibration was measured at LHC Point 4 during a shutdown in February 2012. [...]
Power and Coherence Spectra for use with vibration models: Download fulltextPDF; Download fulltextPDF (PDFA); Download fulltextPS.GZ
Detailed record - Similar records
2012-07-05
11:07
Report to the Desy RPC 2010 / The LCTPC Collaboration [ILC-NOTE-2012-063]
This report was submitted to the PRC at Desy in October 2010; it contains a rather complete description of the TPC status at that time [...]
R&D Report to the Desy PRC 2010 by the LCTPC Collaboration: Download fulltextPDF; Download fulltextPDF (PDFA); Download fulltextPS.GZ
Detailed record - Similar records
2011-11-25
10:04
LCTPC and the Magnetic Field for ILD: Update 2010 / Settles, R. [ILC-NOTE-2011-061]
Fulltext: Download fulltextPDF; Download fulltextPDF (PDFA); Download fulltextPS.GZ
Detailed record - Similar records
2011-10-17
16:48
Optimal Fixed Detuning of the Damping Ring Cavities for the ILC 10 Hz Operation / Gallo, A. [ILC-LNF Technical Note, ILC-LNF-004, October 17, 2011] [ILC-NOTE-2011-060]
Recently a 10 Hz operation modality of ILC linac has been proposed to optimize the collider performances at energies lower than the nominal one. [...]
Optimal Fixed Detuning of the Damping Ring Cavities for the ILC 10 Hz Operation: Download fulltextPDF; Download fulltextPS.GZ
Detailed record - Similar records
Search also:
CERN Indico
SPIRES HEP