2013-04-09 16:47 |
ILC Technical Design Report
/ Barish, B ; Yamada, S
[ILC-REPORT-2013-040]
Detailed record - Similar records
|
2012-12-20 18:25 |
The CESR Test Accelerator Electron Cloud Research Program Phase I Report
/ Palmer, M. A. ; Billing M. G. ; Dugan, G. F. ; Furman, M. A ; et al
[EDMS D*1009305]
[ILC-REPORT-2012-038]
The build-up of the electron cloud (EC) in the positron damping ring (DR) of the International Linear Collider (ILC) is one of the principal risk factors for the overall physics performance of the accelerator. [...]
External link: http://ilc-edmsdirect.desy.de/ilc-edmsdirect/file.jsp?edmsid=*1009305
Detailed record - Similar records
|
2012-09-13 23:39 |
ILC Intra-Train Feedback
/ Smith, S.
[ILC-NOTE-2012-065]
Parameters for the Beam Position Monitor (BPM) and Stripline Kicker that can be used in the ILC Intra-Train Feedback system are derived and performance of the system estimated..
Realistic BPM and Kicker designed & feedback performance estimated.: DOC; DOCX; ODT; PDF (PDFA); PS.GZ
Detailed record - Similar records
|
2012-09-13 23:20 |
Ground Vibration Measurements at LHC Point 4
/ Bertsche, K.J. ; Gaddi, A.
[ILC-NOTE-2012-064]
Ground vibration was measured at LHC Point 4 during a shutdown in February 2012. [...]
Power and Coherence Spectra for use with vibration models: PDF; PDF (PDFA); PS.GZ
Detailed record - Similar records
|
2012-04-20 21:13 |
Seventh International Accelerator School for Linear Colliders Announcement
/ Barish, B ; Chou, W ; Gupta, P D
[ILC-ANNOUNCEMENT-2012-008]
Fulltext: PDF; PDF (PDFA); PS.GZ
Detailed record - Similar records
|
2012-03-07 16:57 |
EC MIN 16.FEB.12
/ HRONEK, M
[ILC-MINUTES-2012-215]
Fulltext: DOCX
Detailed record - Similar records
|
2012-03-07 16:56 |
EC MIN 12.JAN.12
/ HRONEK, M
[ILC-MINUTES-2012-214]
Fulltext: DOCX
Detailed record - Similar records
|
2012-03-07 16:54 |
EC MIN 05 JAN 12
/ HRONEK,M
[ILC-MINUTES-2012-213]
Fulltext: DOCX
Detailed record - Similar records
|
2012-03-07 16:52 |
EC MIN 15.DEC.11
/ Hronek, M
[ILC-MINUTES-2012-212]
Fulltext: DOC; DOCX; ODT; PDF (PDFA); PS.GZ
Detailed record - Similar records
|
2012-02-28 23:45 |
ILC Project Implementation Planning
/ ILC Global Design Effort
[ILC-REPORT-2012-037]
Following the International Committee for Future Accelerators (ICFA) decision to base the design of a global linear collider on superconducting radiofrequency (SCRF) technology, the Global Design Effort (GDE) was created and has carried out the mandate of coordinating the worldwide R&D programme and developing a technical design for a 0.5-TeV linear collider. [...]
External link: ILC Project Implementation Planning
Detailed record - Similar records
|