High Power RF

Latest additions:
2010-12-14
18:50
GDE Change Evaluation Panel - TLCC-2 – Decision Memo / Barish, B ; GDE Change Evaluation Panel [ILC-MEMO-2010-004]
Proposal: "We propose to change the main linac tunnel configuration to one with only a single, accelerator-enclosure tunnel, thereby eliminating the support equipment tunnel proposed in the Reference Design. [...]
Fulltext: Download fulltextPDF; Download fulltextPS.GZ
Detailed record - Similar records
2007-11-20
20:39
Main Linac RF Power Distribution System Heat Load for the ILC Reference Design / Nantista, C.D. [ILC-NOTE-2007-035]
Fulltext: Download fulltextDOC
Detailed record - Similar records
2007-06-27
07:48
R&D for the International Linear Collider / GDE R&D Board ; Willis, W. ; Damerell, C. ; Elsen, E. ; et al [ILC-NOTE-2007-027]
This document attempts to give an overview of the R&D for the ILC. [...]
Fulltext: Download fulltextPDF
Detailed record - Similar records