CERN Accelerating science

CERN Reports

Latest additions:
2025-09-09
12:15
Modelling $b\bar{b}H$ production for the LHC at 13.6 TeV / Biello, Christian (Max-Planck Institute for Physics) ; Wiesemann, Marius (Max Planck Society (DE)) ; Gavardi, Alessandro (DESY) ; von Kuk, Rebecca (DESY) ; Lim, Matthew (University of Sussex and Milano-Bicocca U. and INFN Milano-Bicocca) ; Manzoni, Stefano (CERN) ; Mazzeo, Elena (CERN) ; Mazzitelli, Javier (PSI) ; Sankar, Aparna (Max-Planck Institute and TUM) ; Spira, Michael (Paul Scherrer Institute (CH)) et al.
We present new state-of-the-art predictions for Standard Model Higgs production in association with a bottom-quark pair ($b\bar{b}H$). Updated cross sections are computed in accordance with the recommendations of the LHC Higgs Working Group with a center-of-mass energy of 13.6 TeV. [...]
LHCHWG-2025-011.- Geneva : CERN, 2025 - 45. bbH contribution to Report 5: PDF;

Detailed record
2025-09-08
10:56
Specification for regulated high voltage supplies 300 kV - 1 mA / Author not quoted
CERN-SPS-ABT-RD-Spec-D4-123-Amendment-1.- Geneva : CERN, 1980 - 4 p. Specification

Detailed record
2025-09-08
10:45
Technical specification of a helium gas cooling circuit / Author not quoted
CERN-SPS-BT-PS-JK-Spec-D4-97.- Geneva : CERN, 1976 - 18 p. Specification

Detailed record
2025-09-08
10:29
Specification for high-voltage multi-gap double cathode deuterium thyratrons type CX 1171 B / Author not quoted
CERN-SPS-ABT-HK-Spec-D4-124-Rev.2.- Geneva : CERN, 1978 - 18 p. Specification

Detailed record
2025-09-08
08:55
CERN Open Science Report : 2023/2024
Geneva : CERN, 2025 - 20 p. CERN Open Science Report, 1 Fulltext: PDF;

Detailed record
2025-09-01
13:33
NeutrinoReview 2.0: UI Redesign, System Stabilization, and Scientific Evaluation / Sharma, Uday (CERN)
This report details the development and research work undertaken on the NeutrinoReview application, an AI-powered tool to automate systematic reviews to conduct evidence based research during the 2025 CERN Summer Student Programme. The project began with a comprehensive overhaul of the system, including a complete re-architecture and the redesign of 95% of its web components to significantly improving application design and architecture simplifying the user workflow. [...]
CERN-IT-Report-2025-003.- Geneva : CERN, 2025 Presentation to be presented in the Section Meeting: PPTX;

Detailed record
2025-08-29
16:33
Memorandum. Use of the road tunnel interconnecting laboratories I and II / Klein, A
CERN-LabII-SA-838.- Geneva : CERN, 1973 - 2 p. Technical Note

Detailed record
2025-08-26
00:32
The inclusive Higgs boson cross-section in gluon-gluon fusion in soft-virtual approximation at fourth order in QCD / Das, Goutam (RWTH Aachen University) ; Moch, Sven-Olaf (Hamburg University (DE))
We present precise results for the inclusive Higgs boson cross-section in gluon-gluon fusion at the LHC considering state-of-the-art fourth-order results in perturbative QCD arising from the dominant soft and virtual gluon emissions. Utilizing four-loop QCD results for the gluon-form factor, the splitting function and related anomalous dimen- sions, we study the effects of threshold enhanced soft gluon emissions and estimate their impact on the total cross-section at the fourth order. [...]
LHCHWG-2025-010.- Geneva : CERN, 2025 - 8. Fulltext: PDF;

Detailed record
2025-08-15
10:39
CERN Open Science Governance Framework
2023 - 4.
Full text

Detailed record
2025-08-12
22:02
A Long-Baseline Atom Interferometer at CERN LHC Point 4: Implementation Study / Arduini, G. (CERN) ; Buchmueller, O. (U. Oxford (main) ; Imperial Coll., London) ; Bud, T.A. (CERN) ; Calatroni, S. (ed.) (CERN) ; Crespo-Lopez, O. (CERN) ; Devienne, A. (CERN) ; Ellis, J. (King's Coll. London (main) ; CERN) ; Hakulinen, T. (CERN) ; Infantino, A. (CERN) ; Lafarge, D. (CERN) et al.
Building on the previous feasibility study, this report supported by the Physics Beyond Colliders (PBC) Study Group describes the technical implementation of modifications to the PX46 shaft at LHC Point 4 during LS3 (June 2026 – June 2030) that would enable it to accommodate the installation and operation of a vertical long-baseline Atom Interferometer during Run 4 without affecting LHC operations. We specify in detail the necessary civil‐engineering work, installation of bespoke radiation shielding, deployment of access‐control systems and safety alarms, and design of a mobile elevator platform [...]
arXiv:2508.09694; CERN-PBC Report-2025-004.- Geneva : CERN, 2025 - 33 p. Fulltext: CERN-PBC Report-2025-004 - PDF; 2508.09694 - PDF;

Detailed record